Cadeler: 65% Revenue Growth, a 38% Gross Margin, and a Crane Full of Bad Wire
Guidance was held and the top line grew two-thirds — but mix, Menck dilution and an industry-wide wire-rope failure are doing the talking now, not the backlog
CADLR.OL · Earnings Call · 2026-11-23
A growth headline with a margin problem underneath
On the top line, Cadeler delivered precisely the quarter its bull case required. Revenue of EUR 255.1 million against EUR 154.3 million a year earlier — up 65% — with adjusted EBITDA of EUR 120.4 million versus EUR 109.1 million, and full-year guidance reiterated at EUR 910 million to EUR 1.0 billion of revenue and EUR 435–525 million of adjusted EBITDA. The EUR 2.4 billion backlog was described as "high quality," and Hornsea 3 has passed the halfway mark on monopile installation with turbine installation underway. Then read the second line of the P&L and the picture inverts. Cost of sales rose EUR 99 million to EUR 157 million. Gross margin went from roughly 62% to 38%; EBITDA margin from about 71% to 47%. “Cost of sales increased by EUR 99 million to EUR 157 million, driven by operating costs, including the issues that Mikkel mentioned on the Orca and the Maker” — Peter Brogaard Hansen, Chief Financial Officer · 2026-11-23, the CFO said — and there are three distinct causes stacked on top of each other: a foundation transport-and-installation scope that carries a structurally thinner percentage margin, the consolidation of Menck at roughly a 33% EBITDA margin, and genuine one-off vessel costs. Mikkel Gleerup was blunt that the mix shift is permanent arithmetic, not an accident: “the foundation business, for example, is generating a lower margin number in percentage terms. But in absolute numbers, it's better.” — Mikkel Gleerup, Chief Executive Officer · 2026-11-23 Fair — but investors buying a growth story need to underwrite absolute profit growing faster than revenue, and this quarter the reverse happened: net profit fell to EUR 55 million from EUR 64.6 million.The wires are the story
The operational part is not a rounding error. Wind Orca spent time out of service after a Port of Tyne incident, and the bigger issue is on Wind Maker: wire degradation so rapid it amounts to an industry-wide defect in a new class of crane. The company had to airfreight a replacement wire from Europe to Asia because the degradation ran ahead of the spares it had on hand.The fix is not imminent and not cheap. Maker, Mover and Keeper share the affected crane type and will likely need the same remedy in Q1 next year — deliberately scheduled into a quarter when the vessel was uncontracted anyway. Wind Peak is being pulled for maintenance in Q4 and will not earn. Reported utilization came in at 78%, adjusted to 90.9% for dry-docking and yard transits. That is a respectable adjusted number and it sits well below the message given less than three months earlier: “We expect strong utilization for the rest of the year” — Mikkel Gleerup, Chief Executive Officer · 2026-08-25. Management was explicit that Orca's lost days cannot be recovered inside the year. This is the second consecutive quarter in which technical downtime has been the operative phrase rather than a footnote.We have been challenged by an industry-wide issue where we do see rapid wire degradation across these new crane types, and that has caused an unplanned technical downtime on Wind Maker and also additional costs.
What management stopped talking about
The most revealing thing in this quarter is an absence. In Q3 2025, termination fees was the single highest-momentum keyword in the deck and the call was dominated by the Revolution Wind stop order and the Hornsea 4 cancellation. A year later, those themes have vanished from the top of the narrative entirely. So has the Nexra O&M build-out, which was a talking point for several quarters and has quietly faded. The story has rotated from contract and political risk to execution quality and integration — arguably a healthier problem, but a different one. What is new is telling: hammer sale, package solution, arm's length principle, spare parts, bridge loan. The hammer sale in December now sits inside the guidance range as a swing factor — and when Jamie Franklin asked for its magnitude, the answer was a flat no: "we cannot disclose that for obvious commercial reasons." When a single equipment sale moves a 90-million-wide EBITDA range, opacity there is a legitimate gripe.Hammers, data and the platform pivot
The strategic logic of the Menck acquisition is becoming clearer even as the financial synergies are not. Menck contributed EUR 24 million of revenue, EUR 14 million of cost and about EUR 10 million of EBITDA in seven weeks of ownership. On synergies, Gleerup did not spin:The interim value is defensive: operating Menck at arm's length so peers keep buying its hammers, while eventually offering clients a bundled vessel-plus-hammer package. The longer-term value is data. Cadeler says it holds 50 million data points across jacking and pile-driving conditions, now enriched by Menck's geotechnical records, and intends to convert that into AI technology for decision support in complex soil. “50 million data points, turning that into something that the industry and that we can benefit from is very, very important for us.” — Mikkel Gleerup, Chief Executive Officer · 2026-11-23 It is the most differentiated claim on the call — and, conveniently, the least auditable today. Commercial momentum is real: a firm contract for Wind Apex across 2027–28, a Dogger Bank award starting Q3 2027, and an exclusivity agreement covering both foundations and turbines at a large UK project from 2030. Wind Apex is 87% complete with a Q2 2027 delivery, ahead of schedule. That commercial momentum is being rewarded with disclosure creep, too: a year ago, asked to split foundations from turbines, the CFO said “We have no plans to show segment reporting on that.” — Peter Hansen, Chief Financial Officer · 2025-11-20 On this call, Menck will get its own line in the annual report in March.It's too early because we are not harvesting any synergies yet from the Menck acquisition.